NEWS

(19.03.2012 / sha)

Ji'An Group: Metso-supplied containerboard line with multilayer curtain coating started up

The Metso-supplied containerboard production line, PM 3, for Ji’An Group Co., Ltd. successfully came on stream at the end of November 2011 and the line’s curtain coating process was started up on January 4, 2012.

The new PM 3 was installed at the company’s mill located in Haiyan County, Jiaxing City in Zhejian Province, China. The 7.25 m-wide PM 3 is the world’s fastest coated board machine at the design speed of 1,200 m/min.

Metso’s delivery comprised a complete containerboard line from headboxes to reel including a 3-ply multi-Fourdrinier forming section with a ValFormer top forming unit. The delivery also included a ValPress press section equipped with two straight nips, a dryer section with single- and double-fabric dryer groups, an OptiHard precalender, a ValSizer film size press, coating sections with two ValCoat Jet blade coating stations and an OptiLayer curtain coating station, a ValSoft soft calender as well as a new type of a ValReel reel. The comprehensive Metso automation system comprises process, machine and quality controls with headbox and moisturizer profilers and retention analyzers.

The daily production capacity of the PM 3 is approximately 1,900 t of coated and uncoated white top testliner in the basis weight range of 130 to 280 g/m2, mainly without virgin fiber.